Burton upon Trent ventilation supplier Vortice has given top marks to Barratt contractor Linkwood Services for heat recovery system installation excellence. Linkwood is installing Vortice HR200 Evo heat recovery units in 189 new Barratt homes at Artisan Place in the heart of Harrow.
The development, just 13 minutes by tube from central London, is being built with the latest energy saving features and the Vortice ventilation products are one of a number of energy saving ideas, including smart metering.
Vortice Technical Manager Andrew Dickinson said: “It was a delight to see how well Linkwood Services are carrying out the ventilation installation. Our technical team had worked hard to specify the most energy efficient ventilation design possible for Artisan Place and Linkwood kept our master drawings on site so that their team could refer to them at all times. Their use of self seal ducting has also made the job easier to install and the householders will be rewarded by great energy efficiency.”
Showing posts with label HR200. Show all posts
Showing posts with label HR200. Show all posts
Friday, 10 July 2015
Friday, 24 April 2015
Sarah Oldham joins sales at Vortice
General Manager Kevin Hippey said 'We're very pleased to welcome Sarah to the team here at Vortice as we further strengthen our Internal Sales team.'
In any spare time Sarah likes to read, go to the cinema and eat out with her husband or girlfriends.
Tuesday, 10 March 2015
Vortice Exhibit at ISH in Frankfurt
Vortice will be exhibiting at the
ISH exhibition in Frankfurt from 10th to 14th
March 2015. The Vortice Group stand will
be in Hall 11.1 Stand C41 and will be showing a number of new products as well
as those in its current portfolio of energy efficient ventilation fans.
General Manager Kevin Hippey said:
“We are looking forward to showing new products including the new HR350 Avel
heat recovery unit, the QBK SAL KC kitchen
fan and the single room heat recovery units to visitors at ISH . Vortice is constantly looking to improve on
both commercial and domestic energy efficiency and will showcase energy saving
versions of many of the popular fans at the exhibition. We are extremely pleased
with the array of products which will be on display.”
The UK
head office and training centre for Vortice Ltd is based in Burton on Trent,
but its worldwide offices will all be represented at ISH.
Monday, 2 March 2015
The result has been excellent, with
optimum system design followed by installation and commissioning excellence;
this development is ideally placed to achieve the very best results and provide
healthy, fresh air for its occupants.
Thursday, 10 March 2011
SUCCESS FOR VORTICE AT ECOBUILD

European market leader Vortice, showed a selection of its energy efficient ventilation systems at Ecobuild last week at the Excel Exhibition Centre. Their compact HR200 heat recovery system which offers 93% heat recovery on kitchen plus four wet rooms was a huge success.
National Sales Manager Paul Gunner said: “We connected with both past and new customers at Ecobuild with enormous interest in all our SAP Q eligible products, particularly the heat recovery systems.”
Subscribe to:
Posts (Atom)